Phase 1: H2-sensing Materials Based on Semiconducting Metal Oxides Will Be Improved for Enhanced H2 Selectivity Over Other Gases in Outdoor Industrial Environments. Four Gaseous Interferences Will
Support Operations Coordinator
Operations Planning Specialist (instructor)
Title 5 Financial Management Analyst (mi 127th Cptf)
Locksmith
Financial Accounts Technician
95--plate,metal
25--molding,metal
Solicitation W912CH-25-R-0176 - Collapsible Fabric Tanks (3k, 20k, 50k, 210k US gallon)
Collaboration Opportunity: Cost-effective transition metal oxide catalysts for tunable syngas production
CAREER: CAS: Rational Development of Titanium Photocatalysis for the Generation, Utilization, and Control of Heteroatom-Centered Radicals
Novel magnetic nanotransducers for non-invasive neural stimulation
Development of a dynamic hypothermia protocol for hearing loss prevention
Bioprinted 3D vascular cancer model
Airborne impacts to humans working with plastic recycled construction bricks
FORECASTED LABOR SUPPORT FUNDING NEEDED FOR RESIDENTIAL MAKE READIES, OFFICE MOVES, CUSTOMER SERVICE REQUESTS, AND OTHER MISCELLANEOUS TASKINGS DURING THE 4TH OPTION YEAR (04/25/2026 - 04/24/2027).
International Association of Sheet Metal, Air, Rail and Transportation Workers Political Action League
USMMA ORDER: AGRICULTURE AND METAL DUMPSTER EXCHANGES
THE PURPOSE OF THIS TASK ORDER IS FOR ARA TO INSPECT, FABRICATE, AND INSTALL STRUCTURAL STEEL BRACING IN BUILDING R-24 HIGH BAY AT OHMSETT IN THE FIRM-FIXED-PRICE AMOUNT OF $11,620.55.
INSTALLATION CONTRACT OF FABRICATED PORTAL SIGNS AT VARIOUS SITES ACROSS THE FOREST IAW ATTACHED STATEMENT OF WORK.
100
100
50
100
100
Excellent opportunity — high volume, growing market, accessible to new entrants.