VOCATIONAL PROGRAMS - ELECTRIC- AT FCI EL RENO, OKLAHOMA
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $18,768,335.00, Utilizing an Arpa Broadband Grant of $9,365,399.00, and $ 2,210,000.00 I
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $17,809,169.00, Utilizing an Arpa Broadband Grant of $8,886,775.00, and $1,770,000 in Lo
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $21,487,098.00, Utilizing an Arpa Broadband Grant of $10,000,000.00. This Project Will P
Current Electric, Heating and Air, Inc. Will Construct a Fiber Optic Project With a Total Cost of $9,706,045.00, Utilizing an Arpa Broadband Grant of $7,467,045.00, $1,989,000.00 in Pole Replacement F
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $24,970,916.00, Utilizing an Arpa Broadband Grant of $10,000,000.00, and $1,000,000.00 I
NICHD SERVICES: LAB EQUIPMENT MICROSCOPE MAINTENANCE - SEVERABLE
High-Tech Medical Equipment: VA Has Opportunities to Improve Its Acquisition of Maintenance Services
Veteran Affairs: Acquisition Reorganization Should Reflect Leading Practices
Supervisory Store Associate
Supply Management Specialist
Laborer (Motor Vehicle Operator)
Laborer (Outdoor Equipment Rental)
Management Analyst
Conference: Training the Next Generation of Physical Oceanographers in Seagoing Methods
Travel: 2026 Hilton Head Solid-State Sensors, Actuators and Microsystems Workshop
NETWORK EQUIPMENT
High-Throughput Automated Patch Clamp Instrument
Impact of Waterpipe Size and Heating Source on Exposure, Behavior, and Abuse Liability
Novel magnetic nanotransducers for non-invasive neural stimulation
100
100
50
100
100
Excellent opportunity — high volume, growing market, accessible to new entrants.