Contract
Pier Fuel Reel Replacements for CG Air Station Port Angeles
Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont
Replace Generators & Components Within Everglades
47--adapter,port Cover,
48--ball,valve,ported
Grant
Spending Record
THE CONTRACTOR SHALL PROVIDE THIRD PARTY CONTRACTING (TPC) SERVICES IN SUPPORT OF THE PORT OF SPAIN NEC PROJECT AND PROVIDE 12 MONTHS OF FUNDING FOR MECHANICAL ENGINEERING AND ARCHITECTURE SERVICES.
REMOVE AND REPLACE UNINTERRUPTIBLE POWER SUPPLY BATTERIES AT THE SAN YSIDRO PORT OF ENTRY IN SAN DIEGO, CA. PERIOD OF PERFORMANCE IS 03/27/26-06/25/26. TOTAL ORDER AMOUNT IS $10,722.88.
XR PORT RAD 546B50007 MIAMI VAMC, MIAMI, FL
Research
CAREER: Formally Verified Intermittent Systems with Tiered Trust
CS2: Automatically Extracting High-Level Specifications from Large Scientific Codebases to Enhance Understandability and Correctness
Combined IVUS/FFR microcatheter for guiding complex percutaneous coronary interventions
Computational methods for benchmarking and development of best practices for virus discovery and characterization in the HVP consortium
Job Listing
Supervisory CBP Officer (Port Director)
CBP Officer (Reassignment Opportunity Board)
Administrative/technical Specialist
Marine Cargo Specialist
Administrative/technical Specialist
100
100
50
100
100
Excellent opportunity — high volume, growing market, accessible to new entrants.