Contract
Implementatoin of and Early Childhood Transformation Accelerator and Impact Hub and the Early Development Instrumnet (edi).
Current Electric, Heating and Air, Inc. Will Construct a Fiber Optic Project With a Total Cost of $9,706,045.00, Utilizing an Arpa Broadband Grant of $7,467,045.00, $1,989,000.00 in Pole Replacement F
United Services Will Construct a Fiber Optic Project With a Total Cost of $1,227,185.57, Utilizing an Arpa Broadband Grant of $613,592.78. This Project Will Provide Speeds of at Least 1 Gbps / 100 Mb
Request for Information (RFI) and Industry Day for NASA ARMD Aeronautics Flight Accelerator
Oregon Agency Contract (OR)
Grant
Accelerating Product Excellence in Innovation and for Clinical Adoption (APEx) (U24 Clinical Trial Not Allowed)
Accelerating Product Excellence in Innovation and for Clinical Adoption (APEx) (U24 Clinical Trial Not Allowed)
Accelerating Research and Development of Next Generation Malaria Vaccines Against Malaria – A Model for Mosquito-Borne Diseases
Accelerating Research and Development of Next Generation Malaria Vaccines Against Malaria – A Model for Mosquito-Borne Diseases
Research
A pilot adaptive trial of FITtrack chatbot, nurse navigator, and peer navigator to promote FIT screening among rural residents.
Equipment Upgrade for a 7T Preclinical MRI Scanner at UC Davis
Extended Amygdala Arousal Circuitry and Alcohol-Induced Sleep Disruption
Sodium-glucose cotransporter-2 in Traumatic Brain Injury
Dynamic Imaging with Sparse Total-Body Positron Emission Tomography
Job Listing
100
100
50
100
100
Excellent opportunity — high volume, growing market, accessible to new entrants.