Contract
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $17,809,169.00, Utilizing an Arpa Broadband Grant of $8,886,775.00, and $1,770,000 in Lo
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $4,342,600.00, Utilizing an Arpa Broadband Grant of $2,166,957.00, and $620,000.00 in Lo
A Produce Prescription Program With Tiered Incentive Amounts for Patients With Diabetes and Prediabetes in Los Angeles County
Flight Suits for the Blue Angels
Paving Fire Station Roads on Mt Pinos RD of the Los Padres NF
Spending Record
CARRIER, 20 TON 26-30 FT LO PRO DECK WITH UNDERLIFT STABILIZER
JOB CORPS PRIORITY 3 ESSENTIAL SERVICES ANGELL
COMMITTEE TO ELECT GENEVIEVE ANGEL 2026
ASSESS AND TROUBLESHOOT THE MAIN SWITCH GEAR AND BUSDUCT. PROVIDE REPAIRS TO RESTORE POWER TO THE BUILDING AT LOS ANGELES FEDERAL COURTHOUSE.
Research
EPSCoR Research Fellows: NSF: Securing Next-Generation Advanced Driver Assistance Systems Through Multi-Phase Safety Assurance: From Design to Runtime
Conference: International Conference on Indoor Air Quality, Ventilation, and Energy Conservation in Buildings (IAQVEC) 2026
EPSCoR Research Fellows: NSF: Multiphysics Computational Framework and Reinforcement Learning for Compressible Flows
Multi-user Community Facility for Analyses of Earth Materials
Indoor and Outdoor Exposure to LA Urban Wildfire Smoke – A Nature Experiment between the Palisades and Eaton Fires
Job Listing
Aircraft Overhaul Leader
Technical Director, GPS Ground System-PCC
Flight Operations Coordinator, SBD 3
Supervisory Operations and Administrative Support Specialist, SYD 810
Aircraft Mechanic
85
40
50
10
100
Moderate opportunity — established market with selective entry points.