Contract
Sac Osage Will Construct a Fiber Optic Project With a Total Cost of $3,757,158.90, Utilizing an Arpa Broadband Grant of $3,005,727.12, and $26,520 in Local Government Support. This Project Will Provid
59--tape,insulation,ele
59--shielding Gasket,el
El Malpais Ranger Station Roof Replace
61--installation Kit,el
Grant
Spending Record
Research
Collaborative Research: LTREB Renewal: Experimental determination of trophic dynamics and energy flows in a semiarid habitat
Collaborative Research: LTREB Renewal: Experimental determination of trophic dynamics and energy flows in a semiarid habitat
MRI: Track 1 Acquisition of a Multi-Material Vat Photopolymerization 3D Printer for Interdisciplinary Applications Including Energy Storage, Electronics, and Biomedical
Contrasting the Transient and Equilibrium Responses of Atlantic Tropical Cyclones to Pacific Sea Surface Temperature Patterns
Genetically and metabolically defining high-risk neuroblastoma to exploit effective therapeutic strategies
Job Listing
MWR Cook
Flight Operations Coordinator, SBD 3
Supervisory Operations and Administrative Support Specialist, SYD 810
Supervisory Industry Operations Investigator (Area Supervisor)
Administrative Support Assistant
85
40
50
10
100
Moderate opportunity — established market with selective entry points.