Contract
Spending Record
OVERHAUL OF PROPELLER ASSEMBLY FOR USE ON HC-130J AIRCRAFT.
REPAIR 6 EACH ANTENNAS FOR THE HC-27J AIRCRAFT.
SUMMIT AVIATION REPAIRS ON N22PP AND N11PP WORK ORDERS: SAIWOQ25-00159R1, SAIWOQ25-00159R2, SAIWOQ26-00008R2, SAIWOQ26-00008R1
REPAIR OF FUEL TANKS FOR USE ON THE MH-65 AIRCRAFT.
REPAIR AND/OR OVERHAUL OF THE TRIM/FEEL AND SERIES ACTUATORS USED IN THE MAINTENANCE, REPAIR, AND OVERHAUL OF THE MH65E AIRCRAFT.
85
100
50
100
50
Strong opportunity — solid volume with room for competitive positioning.