Contract
Modification P00014 - the Purpose of This Modification Is to Excavate, Collect Soil Samples, and Perform a Tclp Analysis of Soil Around and Under Seven(7) Identified Septic Tanks.
DESIGN/BUILD CONSTRUCTION FOR ENGINEERING & WEAPONS TRAINING (TEW) BUILDING PHASE 2 AT USCG TRAINING CENTER (TRACEN) YORKTOWN,VIRGINIA
DESIGN/BUILD CONSTRUCTION FOR ENGINEERING & WEAPONS TRAINING (TEW) BUILDING PHASE 2 AT USCG TRAINING CENTER (TRACEN) YORKTOWN,VIRGINIA
Construct Child Development Center, Tinker AFB OK
Construct Child Development Center, Tinker AFB OK
Spending Record
DESIGN BUILD CHASE HALL BARRACKS ANNEX D MID-LIFE RENOVATIONS PHASE VI, AT U.S. COAST GUARD ACADEMY, NEW LONDON, CT.
DESIGN/BUILD CENTER REDEVELOPMENT AT THE ARECIBO JOB CORPS CENTER
OCON INSTALL PROPANE GAS LINES IN ACCORDANCE WITH THE SCOPE OF WORK.
Great Plains Deferred Maintenance (dm)-south Dakota
FIBER UPGRADES
70
100
50
100
50
Strong opportunity — solid volume with room for competitive positioning.