Opening in Bureauify…
ActiveRegulation

Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

Transportation Department, Federal Highway Administration

NAICS 236220
Source: Federal Register
OverviewIntelligenceProposals

Key Details

Posted Date
NAICS Code
236220
Source
Federal Register
Contract Type
regulation

Description

This notice announces actions taken by the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, US 18/151 (Verona Road) CTH PD to US 12/14 and US 12/14 (Beltline) Whitney Way to Todd Drive in Dane County, Wisconsin. Those actions grant approvals for the project. The project will be constructed in three stages. Stage 1 entails reconstructing the current US 18/151 and US 12/14 diamond interchange to a single-point urban interchange and extending the six-lane US 12/14 section west through the Whitney Way interchange. The Beltline reconstruction will extend from west of Whitney Way to east of Seminole Highway and will include reconstruction of the Seminole Highway overpass. The US 12/14 modifications will include expanding the Whitney Way westbound off-ramp and the Whitney Way eastbound on-ramp to two lanes and add a parallel lane to the Whitney Way westbound on-ramp. US 18/151 (Verona Road) will be reconstructed from Raymond Road to US 12/14 and include capacity expansion. Midvale Boulevard will be reconstructed between US 12/14 and Nakoma Road. A jug-handle grade-separated intersection will be constructed at the current Summit Road at-grade intersection with US 18/151. Four lanes southbound and three lanes northbound will be provided on US 18/151 from Nakoma Road on Midvale Boulevard to Summit Road. Stage 1 is currently scheduled for construction from approximately 2013 to 2015. Stage 2 will convert the CTH PD and US 18/151 at-grade intersection to a diamond interchange. Stage 2 will also include a third lane in both directions on US 18/151 from the CTH PD interchange to the Raymond Road intersection and upgrade the Williamsburg Way at-grade intersection. CTH PD will be reconstructed from west of Nesbitt Road to Commerce Park Drive. Stage 2 is currently scheduled for construction from approximately 2017 to 2018. Stage 3 will be constructed when operations and safety needs become a statewide priority and funding is available. This is currently predicted for around 2030. Stage 3 will separate local and regional traffic by constructing a depressed freeway down the center of Verona Road. A US 151/18 system interchange with depressed US 18/151 ramps will be constructed east of the Verona Road Single-point interchange. A one-way pair local road system will front the depressed US 18/151 freeway. Raymond Road and Williamsburg Way will be grade-separated over US 18/151 freeway. The environmental document will be re-evaluated in coordination with federal, state and local agencies prior to the implementation of Stage 3. Therefore, this notice of limitations does not apply to Stage 3.

Frequently Asked Questions

Is this regulation still open?+
Yes — this regulation from Transportation Department, Federal Highway Administration is currently accepting responses. Track it on Bureauify for deadline alerts.
How do I apply for this regulation?+
Review the full solicitation documents on the source website (SAM.gov or Grants.gov), prepare your proposal per the instructions, and submit before the deadline. Use Bureauify to track the opportunity and get reminders.

Track This Regulation

Get alerts and track updates with Bureauify.

Track in BureauifyView on Federal Register

Intelligence

  • Win probability analysis
  • Competitive landscape
  • Incumbent analysis
  • Price-to-win estimate
  • Similar awards history
Open in Bureauify for full intelligence →

Data sourced from Federal Register

Search Government Records

100M+ government records — search across all categories

Notice of Final Federal Agency Actions on Proposed Highway P — Transportation Department, Federal Highway Administration | Bureauify