Bluff Spur Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Energy Department, Federal Energy Regulatory Commission

NAICS 562910
Source: Federal Register
OverviewIntelligenceProposals

Key Details

Posted Date
NAICS Code
562910
Source
Federal Register
Contract Type
regulation

Description

DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15425-000] Bluff Spur Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 24, 2026, Bluff Spur Pumped Storage, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Bluff Spur Energy Storage Project (Bluff Spur Project or project) to be located in Wise County, Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Bluff Spur Project would consist of the following: (1) a new excavated upper reservoir having a surface area of 70 acres and a total storage capacity of approximately 2,400 acre-feet at a normal maximum water surface elevation of 3,620 feet North American Vertical Datum of 1988 (NAVD88); (2) a new 1,140-foot-long, 150-foot-high earthen embankment type dam forming a lower reservoir having a surface area of 70 acres and a total storage capacity of approximately 2,400 acre-feet at a normal maximum water surface elevation of 2,280 feet NAVD88; (3) a 15-foot-diameter, 5,000-foot-long concrete and steel-lined tunnel connecting the upper and lower reservoirs and bifurcating at the powerhouse; (4) a new 100-foot-diameter circular open pit type powerhouse containing two turbine-generator units with a total rated capacity of 300 megawatts; (5) a new 3.4-mile-long, 161-kilovolt transmission line connecting the project to a substation; and (6) appurtenant facilities. Initial fill and make-up water for the project would come from adjacent waterways and/or groundwater wells. The proposed project would have an annual generation of 840 gigawatt-hours. Applicant Contact: Sandy Slayton, Rye Development, LLC, 100 South Olive Avenue, West Palm Beach, FL 33401; phone: 206-919-3976. FERC Contact: Monir Chowdhury; phone: (202) 502-6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: on or before 5:00 p.m. Eastern Time on August 17, 2026. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 10,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/QuickComment.aspx. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov. More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's website at https://elibrary.ferc.gov/eLibrary/search. Enter the docket number (P-15425) in the docket number field to access the document. For assistance, contact FERC Online Support. (Authority: 18 CFR 2.1) Dated: June 17, 2026. Debbie-Anne A. Reese, Secretary. [FR Doc. 2026-12624 Filed 6-23-26; 8:45 am] BILLING CODE 6717-01-P

Frequently Asked Questions

Is this regulation still open?+
Yes — this regulation from Energy Department, Federal Energy Regulatory Commission is currently accepting responses. Track it on Bureauify for deadline alerts.
How do I apply for this regulation?+
Review the full solicitation documents on the source website (SAM.gov or Grants.gov), prepare your proposal per the instructions, and submit before the deadline. Use Bureauify to track the opportunity and get reminders.

Track This Regulation

Get alerts and track updates with Bureauify.

Track in BureauifyView on Federal Register

Intelligence

  • Win probability analysis
  • Competitive landscape
  • Incumbent analysis
  • Price-to-win estimate
  • Similar awards history
Open in Bureauify for full intelligence →

Data sourced from Federal Register

Search Government Records

100M+ government records — search across all categories

Bluff Spur Pumped Storage, LLC; Notice of Preliminary Permit — Energy Department, Federal Energy Regulatory Commission | Bureauify