Contract
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $17,809,169.00, Utilizing an Arpa Broadband Grant of $8,886,775.00, and $1,770,000 in Lo
White River Valley Electric Cooperative, Incorporated Will Construct a Fiber Optic Project With a Total Cost of $4,342,600.00, Utilizing an Arpa Broadband Grant of $2,166,957.00, and $620,000.00 in Lo
A Produce Prescription Program With Tiered Incentive Amounts for Patients With Diabetes and Prediabetes in Los Angeles County
Pier Fuel Reel Replacements for CG Air Station Port Angeles
Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont
Spending Record
Angel for Maryland
THE CONTRACTOR SHALL PROVIDE THIRD PARTY CONTRACTING (TPC) SERVICES IN SUPPORT OF THE PORT OF SPAIN NEC PROJECT AND PROVIDE 12 MONTHS OF FUNDING FOR MECHANICAL ENGINEERING AND ARCHITECTURE SERVICES.
REMOVE AND REPLACE UNINTERRUPTIBLE POWER SUPPLY BATTERIES AT THE SAN YSIDRO PORT OF ENTRY IN SAN DIEGO, CA. PERIOD OF PERFORMANCE IS 03/27/26-06/25/26. TOTAL ORDER AMOUNT IS $10,722.88.
Research
CAREER: Formally Verified Intermittent Systems with Tiered Trust
Biological signatures of prenatal wildfire smoke exposure and fetal and infant growth
CS2: Automatically Extracting High-Level Specifications from Large Scientific Codebases to Enhance Understandability and Correctness
EPSCoR Research Fellows: NSF: Securing Next-Generation Advanced Driver Assistance Systems Through Multi-Phase Safety Assurance: From Design to Runtime
Conference: International Conference on Indoor Air Quality, Ventilation, and Energy Conservation in Buildings (IAQVEC) 2026
Job Listing
Laborer (Outdoor Equipment Rental)
Supervisory CBP Officer (Port Director)
Program Support Specialist
CBP Officer (Reassignment Opportunity Board)
Aircraft Mechanic
100
100
50
100
100
Excellent opportunity — high volume, growing market, accessible to new entrants.