Contract
USDA NRCS-Ohio EWP Green Township - Blessing Road
Service Gate #1 Wire Rope and Lower Sheave Block Replacement, Franklin Falls Dam, Franklin, NH
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
Shenango River Lake Water Tank Rehabilitation Project
Daugherty Wetland Restoration Project Clark County, Illinois
Spending Record
DESIGN/BUILD CONSTRUCTION FOR CHARLESTON PIER MIKE RECAPITALIZATION, USCG BASE CHARLESTON, SOUTH CAROLINA
RANGER OFFICE BUILDING UPGRADES, CAPE COD CANAL, BUZZARDS BAY, MA
EROSION CONTROL MEASURES ON J.E. PERKINS ROAD IN FORREST COUNTY, MISSISSIPPI THIS PROJECT CONSISTS OF ALL LABOR AND MATERIALS TO RESTORE AND STABILIZE THE CHANNEL AND EXPOSED WATERLINE ALONG J. E. PE
THIS ANNOUNCEMENT IS TO PROVIDE EMERGENCY WATERSHED PROTECTION (EWP) - BRAXTON COUNTY STREAMBANK STABILIZATION PROJECT, WEST VIRGINIA. THE WORK CONSISTS OF RESTORING AND STABILIZING APPROXIMATELY 300
FORMOSA MINE SUPERFUND SITE REMOVAL
85
100
50
100
50
Strong opportunity — solid volume with room for competitive positioning.