Contract
Z2DA--FY26: NRM (PROJ: 516-22-602) BB Install Alternate Connections for Steam and Chilled Water – Lee County
Z2DA--589A5-23-199, AJP FCA - Replace existing roofing, window, Security Cameras
Z2DA--619A4-22-700 EHRM Infrastructure Upgrades Tuskegee Construction
Z2DA--626-25-101 - Upgrade Critical Environments I
Z2DA--Flooring Renovation, Installation, and Repalcement Services SATOC/IDIQ
Spending Record
RENOVATE MRI ROOM
C201747 REPLACE THE FAILED STEAM-TO-HOT WATER HEAT TRANSFER PACKAGE, BUILDING 30 LABS
631-26-008 REPAIR MASONRY AND FOUNDATIONS BUILDING 7 20 26.
VISN 1 CONSTRUCTION MATOC CONTRACT FOR B-WING (6TH FLOOR) ROOF REPAIR
VISN 1 ASBESTOS IDIQ
85
100
50
100
50
Strong opportunity — solid volume with room for competitive positioning.