Contract
Current Electric, Heating and Air, Inc. Will Construct a Fiber Optic Project With a Total Cost of $9,706,045.00, Utilizing an Arpa Broadband Grant of $7,467,045.00, $1,989,000.00 in Pole Replacement F
High Pressure Gas Facility (HPGF) Air Dryer Refurbishment
29--air Cleaner,intake
Support, Bearing, Air
16--controller,air Pres, in Repair/modification of
Research
Travel: Moduli Spaces, Quantization and Poisson Geometry
Radioisotope Monitoring Program for the United States Academic Research Fleet
RAPID: Quantifying the Impacts of Canadian Wildfires on Ambient Aerosols in Atlanta
Multi-omics of fine particulate matter and chronic kidney disease
Airborne impacts to humans working with plastic recycled construction bricks
Job Listing
Intelligence Specialist
Food Service Worker- Direct Hire Authority
Air Safety Investigator (REG)
Air Safety Investigator (REG)
Operations Planning Specialist (instructor)
Audit
Military Personnel: DOD Should Improve Processes for Determining Cost-of-Living Allowances
Aviation Workforce: FAA Could Strengthen Regional Pilot Pipeline by Establishing Timelines for Training Initiatives
Hydrogen Energy: Technologies Offer Potential Benefits but Face Challenges to Widespread Use
Weapon System Sustainment: DOD Identified Critical Cost Growth, and the Army Should Take Action to Yield Cost Savings
100
100
50
100
100
Excellent opportunity — high volume, growing market, accessible to new entrants.